Floor M

Product Details

In the first stage of production, after cleaning the ground with pressurized water and air, the primer application will be done with 0,150-0,200 kg/m2 consumption in the areas in which the coating will be applied. After having the cure following the primer application, SBR granular material having a diameter of 1-3 or 1-4 mm tied with Imported Polyurethane Prepolymer (Binder) will be laid on the field with the help of special machines. This layer should not be lower than 10 mm. After curing this layer, one layer two-component thixotropic sealer (paste) will be applied. This layer will be applied onto the brick colored pure polyurethane soil binder having 3 mm in thickness by a comb trowel following curing and the necessary controls. EPDM material of 1-4 mm in diameter will be sprinkled before this layer had not cured yet. After this layer cured, EPDM material remained on the ground are picked up by sprinkling. System will be 13 mm in thickness in minimum when finished. 

Sruface Floor M
Quality Synthetic coating will be carried out in accordance with IAAF requirements of the International Association of Athletics Federations, EU norms and the German standard DIN-18035/6 or other equivalent national standards
Thickness 10mm+

Continue to explore Floor M

epdm surface

athletic-track

Contact now

Get In Touch With Us